HELP DESK
Agent (All Working Days)
Sri Anumula Revanth Reddy
Hon’ble Chief Minister and Minister MA&UD

Road Works

Development Department

In Cyberabad Development Area (CDA)

  • Road from 8th Batallion Road (Kondapur Main Road) to NAC Road Via Hanuman Nagar and Izzat Nagar (Length 1.10 km) Outlay Rs. 2.31 crores
  • Widening of Existing Road from Judges Colony to Old Bombay Road: The road is widened to 24 Mts from 7.5 Mts with an expenditure of Rs. 56.00 lakhs
  • Strengthening of Existing Road from State Art Gallery to Madhapur Police Station through Kavuri hills: The existing road is strengthened with an expenditure of Rs. 22 lakhs
  • Development of Road Over Bund in Front of Convention Centre at Hitex (NAC):The road on the existing bund of the lake in front of ICC with a pedestrian pathway are completed with an expenditure of Rs. 22.60 lakhs
  • Road from Kavuri hills road Junction to Shilparamam Reach-I was taken up, with an outlay of Rs. 8.39 crore. It is a 2 Lane carriageway with a width of 9 M width and a length of 1.75 km (Length 1.75 km with 2 carriageway of each 9.0 M)
  • Link road connecting Madhapur Main road: A road 18 M wide and 360 M long connecting Madhapur road at COD to the road on the western side of Durgam Cheruvu, with an estimated cost of Rs. 1.55 Crores. About 300 M have been completed. The work in the stretch of 60 M has been held up due to the courts status quo on land acquisition

In Hyderabad Airport Development Authority (HADA)

  • Road connecting Palmakul Village on NH-7 to ORR near Golkonda Khurd (P1)
  • This Road was taken up at an estimated cost of Rs. 48.95 Crores. The total length of the road is 9.34 Kms. with a ROW of 36Mts with 4-lane divided carriageway with central median of 10.0 Mts wide for a length of 4.00 Kms and 4-lane carriageway with a central median of 2.0 Mts wide for a length of 5.34 Kms.

    The Road work is completed and opened to traffic in December, 2011. The total expenditure incurred on this Road is Rs.47.75 Crores.

  • Road connecting (Inner Ring Road to Mailardevpally via Laxmiguda, Jalpally and Mamidipally to Srisailam Highway) (P7)
  • This Road was taken up with an estimated cost of Rs. 51.54 crores. The length of the road is 7.743 Kms with 4- lane divided carriageway (including Link Road of 843 Mts). The road work for a length of 7.423 Kms is completed and opened to traffic. The balance length of 280 Mts road work in 2 pockets in Sy.no. 145 of Mailardevpally (V) and Sy.no. 67/2 of Jalpally (v) could not be taken up due to land litigation.

Hyderabad Metropolitan Development Authority

Swarna Jayanti Complex, Sanjeeva Reddy Nagar, Srinivasa Nagar, Ameerpet, Hyderabad – 500038. Telangana, India

Email: applicantsupport@hmda.gov.in Visiting Hours : 3PM to 5PM HMDA LRS Help Desk: 27018115.

Quick Links

Other Links

Copyright © 2024. All rights reserved by HMDA, Telangana.