Road from 8th Batallion Road (Kondapur Main Road) to NAC Road Via Hanuman Nagar and Izzat Nagar (Length 1.10 km) Outlay Rs. 2.31 crores
Widening of Existing Road from Judges Colony to Old Bombay Road: The road is widened to 24 Mts from 7.5 Mts with an expenditure of Rs. 56.00 lakhs
Strengthening of Existing Road from State Art Gallery to Madhapur Police Station through Kavuri hills: The existing road is strengthened with an expenditure of Rs. 22 lakhs
Development of Road Over Bund in Front of Convention Centre at Hitex (NAC):The road on the existing bund of the lake in front of ICC with a pedestrian pathway are completed with an expenditure of Rs. 22.60 lakhs
Road from Kavuri hills road Junction to Shilparamam Reach-I was taken up, with an outlay of Rs. 8.39 crore. It is a 2 Lane carriageway with a width of 9 M width and a length of 1.75 km (Length 1.75 km with 2 carriageway of each 9.0 M)
Link road connecting Madhapur Main road: A road 18 M wide and 360 M long connecting Madhapur road at COD to the road on the western side of Durgam Cheruvu, with an estimated cost of Rs. 1.55 Crores. About 300 M have been completed. The work in the stretch of 60 M has been held up due to the courts status quo on land acquisition
In Hyderabad Airport Development Authority (HADA)
Road connecting Palmakul Village on NH-7 to ORR near Golkonda Khurd (P1)
This Road was taken up at an estimated cost of Rs. 48.95 Crores. The total length of the road is 9.34 Kms. with a ROW of 36Mts with 4-lane divided carriageway with central median of 10.0 Mts wide for a length of 4.00 Kms and 4-lane carriageway with a central median of 2.0 Mts wide for a length of 5.34 Kms.
The Road work is completed and opened to traffic in December, 2011. The total expenditure incurred on this Road is Rs.47.75 Crores.
Road connecting (Inner Ring Road to Mailardevpally via Laxmiguda, Jalpally and Mamidipally to Srisailam Highway) (P7)
This Road was taken up with an estimated cost of Rs. 51.54 crores. The length of the road is 7.743 Kms with 4- lane divided carriageway (including Link Road of 843 Mts). The road work for a length of 7.423 Kms is completed and opened to traffic. The balance length of 280 Mts road work in 2 pockets in Sy.no. 145 of Mailardevpally (V) and Sy.no. 67/2 of Jalpally (v) could not be taken up due to land litigation.